The construction cost of 500 square yards Premium A+ quality house with basement in DHA Karachi.

Construction Material Price

Cement: Falcon Cement Price @Rs 1060/-

Steel: Amreli Steel Price @Rs 2,35,000/-

Crush: @Rs 31,000/- Per Dumper

Mix: @Rs 29,000/- Per Dumper

Raiti: @Rs 29,000/- Per Dumper

Stone: @Rs 18,000/-Per Dumper

Bhalo mitti: @12,000/- Per Dumper

Anti-termite: @ 7,000/- per set

Water tanker: 3600 Gallon @Rs 5,000/-

Shuttering wire: @Rs 350/- per Kg

Marble: @ Rs 700/- Sqft

Tiles: @Rs 3500 -9000/- Sqft Full Frame Tile

Burma Teck wood: @Rs 21000/- Cubic feet (4 Grade)

Wallpaper: @Rs 4000/- per roll

Jacuzzi: @Rs 1,50,000/- Starting

Corian: @Rs 3,000 to Rs 4,000/- Per Sq.ft

Blocks:

6 x 8 x 12 Solid @ Rs 57/-

5 x 8 x 12 Solid @ Rs 35/-

4 x 8 x 12 Solid @ Rs 42/-

3 x 8 x 12 Solid @ Rs 35/-

2 x 8 x 12 Solid @ Rs 32/-

 

Contractor/Labor Rates

Dewatering Cost: @Rs 3,500 - 4,000/- per day

Carpentry: @Rs 10,00,000 – 15,00,000/- Lumpsum depend on work

Excavator: Rs 30,000 per day

Landscape: @Rs 1,50,000/-

Shuttering: @Rs 35- Rs 40/-

Electrician: @Rs 3,00,000 to 5,00,000/- Lumpsum

Paint and Polish: @Rs 13,00,000/- to 15,00,000 Lumpsum

Steel Fixer: @Rs 8,500 - 9,000/- ton

Concrete Pouring: @Rs25000 to 45,000 per day depending on the area

Plumber: @Rs 65,000 per bathroom. Or Rs. 3,50,000-/ lumpsum

Tile Mason: @Rs 70/- per small piece - @Rs 160/- per Large piece 8 x 4

Marble Mason: @Rs 160/- per piece 8 x 4

 

Contractor With Material Price


Water Proofing Chemicals and Labor: @6,00,000/-

Swimming pool Contractor: @Rs 6,00,000 to 10,00,000 Depend on Requirements


And other remaining Kitchen, Electronics items, Hardware, Sanitary, Landscape, Garage, indirect material, generator fuels, Paint and polish, woodwork ( MDF, lamination, oak ply, acrylic sheets), Mirror, Window Glasses, Railing, Safety grills, Main gate, Labor( Concrete pouring, masonry, plaster, tile fixer, stone fixer, Ac pipe fixer, Demarcation).

 

Total Construction Cost of 500 square yards Bungalow with basement in DHA Karachi

(Premium finish A+ grade).


With Basement

Rs 6000 – 7000/- Per Square foot With Material (Finishing) A+

Rs 1300 – 1500/- Per Square foot Labor rate Without Material (Grey Structure) A+


Without Basement

Rs 5000 – 6500/- Per Square foot With Material (Finishing) A+

Rs 1000 –1300/- Per Square foot Labor rate Without Material (Grey Structure) A+

PLOT SIZE

ESTIMATED COVERED AREA

PER SQ.FT RATE

CONSTRUCTION COST

240 SQ YARDS

4700 SQUARE FEET

(Without Basement)

RS.4000 SQ. FEET

RS. 1,88,00,000/-

400 SQ YARDS

6300 SQUARE FEET

(Without Basement)

RS.4000 SQ. FEET

RS. 2,52,00,000/-

500 SQ YARDS

7900 SQUARE FEET

RS.6000 SQ. FEET

RS. 4,74,00,000/-

666 SQ YARDS

11500 SQUARE FEET

RS.6000 SQ. FEET

RS. 6,90,00,000/-

1000 SQ YARDS

16000 SQUARE FEET

RS.7000 SQ. FEET

RS. 9,60,00,000/-


Disclaimer:

Possible ±5% Variation in cost

Skills required to achieve this cost

Past experience

Quality & honest labor or Labor management skills

Quality, timely & cost-effective material procurement

Hire a professional company that will add a figure of 8% to 10% minimum as margin.


For Inquiries:

Call or WhatsApp at + (𝟵𝟮) 𝟯𝟒𝟐 𝟑𝟕𝟐𝟒𝟎𝟔𝟎 (Tashif Ahmed)


If you found it informative Follow us on Facebook and Instagram for more updates




Our Completed Projects





3,139 views

Recent Posts

See All
  • Facebook
  • Instagram
  • YouTube
  • LinkedIn
  • Pinterest
Follow Us 

Find out the cost of the project right now