Latest Construction Cost in Karachi 2023

Updated: 2 days ago

The Limitless Associates Posted Updated on 1 FEB 2023

 

The construction cost of 500 square yards Premium A+ quality house with basement in DHA Karachi.

Construction Material Price

Cement: Falcon Cement Price @Rs 1060/-

Steel: Amreli Steel Price @Rs 2,80,000/-

Crush: @Rs 31,000/- Per Dumper

Mix: @Rs 29,000/- Per Dumper

Raiti: @Rs 29,000/- Per Dumper

Stone: @Rs 18,000/-Per Dumper

Bhalo mitti: @12,000/- Per Dumper

Anti-termite: @ 7,000/- per set

Water tanker: 3600 Gallon @Rs 5,000/-

Shuttering wire: @Rs 350/- per Kg

Marble: @ Rs 700/- Sqft

Tiles: @Rs 3500 -9000/- Sqft Full Frame Tile

Burma Teck wood: @Rs 30000/- Cubic feet (4 Grade)

Wallpaper: @Rs 4000/- per roll

Jacuzzi: @Rs 1,50,000/- Starting

Corian: @Rs 3,000 to Rs 4,000/- Per Sq.ft

Blocks:

6 x 8 x 12 Solid @ Rs 57/-

5 x 8 x 12 Solid @ Rs 47/-

4 x 8 x 12 Solid @ Rs 42/-

3 x 8 x 12 Solid @ Rs 36/-

2 x 8 x 12 Solid @ Rs 35/-

 

Contractor/Labor Rates

Dewatering Cost: @Rs 3,500 - 4,000/- per day

Carpentry: @Rs 10,00,000 – 15,00,000/- Lumpsum depend on work

Excavator: Rs 30,000 per day

Landscape: @Rs 1,50,000/-

Shuttering: @Rs 35- Rs 40/-

Mason: Plaster @Rs32 Sq.ft - and 30 per Block

Electrician: @Rs 3,00,000 to 5,00,000/- Lumpsum

Paint and Polish: @Rs 13,00,000/- to 15,00,000 Lumpsum

Steel Fixer: @Rs 8,500 - 9,000/- ton

Concrete Pouring: @Rs25000 to 45,000 per day depending on the area

Plumber: @Rs 65,000 per bathroom. Or Rs. 3,50,000-/ lumpsum

Tile Mason: @Rs 70/- per small piece - @Rs 160/- per Large piece 8 x 4

Marble Mason: @Rs 160/- per piece 8 x 4 with resizing

 

Contractor With Material Price


Water Proofing Chemicals and Labor: @6,00,000/-

Swimming pool Contractor: @Rs 6,00,000 to 10,00,000 Depend on Requirements


And other remaining Kitchen, Electronics items, Hardware, Sanitary, Landscape, Garage, indirect material, generator fuels, Paint and polish, woodwork ( MDF, lamination, oak ply, acrylic sheets), Mirror, Window Glasses, Railing, Safety grills, Main gate, Labor( Concrete pouring, masonry, plaster, tile fixer, stone fixer, Ac pipe fixer, Demarcation).

 

Total Construction Cost of 500 square yards Bungalow with basement in DHA Karachi

(Premium finish A+ grade).


With Basement

Rs 7000 – 8000/- Per Square foot With Material (Finishing) A+

Rs 1400 – 1600/- Per Square foot Labor rate Without Material (Grey Structure) A+


Without Basement

Rs 5000 – 6500/- Per Square foot With Material (Finishing) A+

Rs 1000 –1300/- Per Square foot Labor rate Without Material (Grey Structure) A+


Plot Size (Sq. Yards)

Estimated

Covered Area

(G.F Floor)

Construction Cost

Rs 5000 per Sq.ft

(G+F Floor)

Estimated

Covered Area

(With Basement)

Construction Cost

Rs 8000 per Sq.ft

(With Basement)

240

Sq.Yards

4088

Square Feet

Rs.2,45,28,000

​-

-

300

Sq.Yards

4047.5

Square Feet

Rs.2,42,85,000

5397.5

Square Feet

Rs.4,31,80,000

400

Sq.Yards

5330

Square Feet

Rs.3,19,80,000

7130

Square Feet

​Rs.5,70,40,000

500

Sq.Yards

5757.5

Square Feet

Rs.3,45,45,000

8007.5

Square Feet

Rs.6,40,60,000

600

Sq.Yards

7602.59 Square Feet

Rs.4,56,15,540

10599.59 Square Feet

Rs.8,47,96,720

800

Sq.Yards

9092

Square Feet

Rs.5,45,52,000

12692

Square Feet

Rs.10,15,36,000

1000

Sq.Yards

​9605

Square Feet

Rs.5,76,30,000

14105

Square Feet

Rs.11,28,40,000

2000

Sq.Yards

17300

Square Feet

Rs.10,38,00,000

26300

Square Feet

Rs.21,04,00,000

Our team is excited to update our Grey Structure Cost list with current pricing. If you're a plot owner we've got you covered with competitive rates in Karachi so that you can budget for your next project confidently.


Get a quote with us today to get started on your new home construction.




Our Team of experts is here to help you every step of the way.

For Inquiries:

Call or WhatsApp at + (𝟵𝟮) 𝟯𝟒𝟐 𝟑𝟕𝟐𝟒𝟎𝟔𝟎 (Tashif Ahmed)


Disclaimer:

Possible ±5% Variation in cost

Skills required to achieve this cost

Past experience

Quality & honest labor or Labor management skills

Quality, timely & cost-effective material procurement

Hire a professional company that will add a figure of 8% to 10% minimum as a margin.