top of page
  • Writer's pictureTanis Ahmed Shaikh

Latest Grey Structure Cost in Karachi 2023

Updated: Aug 26

Get the latest A+ grey structure cost estimates in Karachi. Compare prices from top contractors and save money on your next construction project.


Grey Structure Cost in Karachi

Content:

  1. What is Grey Structure?

  2. What is included in the grey structure labor rate contract?

  3. Grey Structure does not include the following elements

  4. Sub-contractors included in the Grey Structure Labor Rate Contract

  5. Latest Labor Rates of A+ Grey Structure in DHA Karachi

  6. 10 Tips for Cutting Construction Costs: How to Save Money During Construction of House!

Grey Structure Cost in Karachi 2023

What is Grey Structure?

A grey structure is a building that is in the early stages of construction, typically before the installation of finishes such as flooring, walls, and ceilings. The structure is often referred to as "grey" because it is not yet complete and may not have all of the necessary systems installed.


What is included in the grey structure labor rate contract?

Grey structure refers to everything that appears grey when finished. Before signing a contract, the items below must be agreed upon, regardless of their grey structure.

  • Excavation

  • Backfilling

  • Reinforced Concrete for Structure

  • R.C.C and P.C.C Work

  • Block Mansory

  • Internal and external Plaster

  • Shuttering (Framework)

  • Underground Tank and Overhead Tank

The following items are generally charged separately

  • Septic tank

  • Boundary wall

  • Passage area

  • Outer stairs

  • Retaining Wall

  • Car porch

  • Planter

  • Projection

  • Door and wood Frame fitting during masonry work

Grey Structure does not include the following elements:

  • Electrical wiring

  • Plumbing work (Waterline pipe and sewerage)

  • Carpentry

  • Tile / Marble Fixing Mason

  • Paint and Polish works

  • Waterproofing

  • Stone Work

  • Dewatering

  • Boring

  • Main Gate / Grill

Sub-contractors included in the Grey Structure Labor Rate Contract

  • Excavator

  • Mason

  • Shuttering

  • Steel fixer

  • Concrete Pouring contractor

  • Supervisor

Latest Labor Rates of A+ Grey Structure in DHA Karachi

Grey Structure of Ground and First Floor Labor rates only (W/O Material)

Plot Size (Sq. Yards)

Allowed Covered Area

Est.

Covered Area (G+F Floor)

Grey Structure Labor Rate 1300/- Sq.ft (G+F Floor)

Est.

Covered Area

(With Basement )

Grey Structure Labor Rate

1500/- Sq.ft

(With Basement)

240

90%

4088 SQ.FT

Rs. 53,14,400

5384 SQ.FT

Rs.80,76,000

300

75%

4047.5 SQ.FT

Rs. 52,61,750

5397.5 SQ.FT

Rs.80,96,250

400

75%

5330 SQ.FT

Rs. 69,29,000

7130 SQ.FT

Rs.1,06,95,000

500

65%

5757.5 SQ.FT

Rs. 74,84,750

8007.5 SQ.FT

Rs.1,20,11,250

666

65%

7602.6 SQ.FT

Rs. 98,83,367

10599.6 SQ.FT

Rs. 1,58,99,385

800

65%

9092 SQ.FT

Rs. 1,18,19,600

12690 SQ.FT

Rs. 1,90,38,000

1000

55%

9604 SQ.FT

Rs. 1,24,86,500

14105 SQ.FT

Rs. 2,11,57,500

2000

50%

17300 SQ.FT

Rs. 2,24,90,000

26300 SQ.FT

Rs. 3,94,50,000

Swipe left ➡️ to see more

Our team is excited to update our Grey Structure Cost in Karachi 2023 list with the most current pricing available. If you're a plot owner we've got you covered with competitive rates in Karachi, so you can budget for your next project with confidence.


Get a quote with us today to get started on your new home construction.

Our Team of experts is here to help you every step of the way.


For Inquiries:

Call or WhatsApp at + (𝟵𝟮) 𝟯𝟒𝟐 𝟑𝟕𝟐𝟒𝟎𝟔𝟎 (Tashif Ahmed)



"10 Tips for Cutting Construction Costs: How to Save Money During Construction Of Your House!"

  1. Structural drawings of grey structures can help to optimize the use of materials, reducing waste and saving money and time on construction costs.

  2. Shop around for materials to get the best deal.

  3. Compare prices on materials to get the best value.

  4. Keep an eye out for sales and discounts.

  5. Choose a more efficient design.

  6. Hire a project manager to stay on budget.

  7. Consider modular or prefabricated construction.

  8. Budget for unexpected expenses.

  9. Negotiate with contractors for lower prices.

  10. Do some of the work yourself to save on labor costs.

If you found it informative Follow us on Facebook and Instagram for more updates




Do you find the information given above to be useful?

  • Yes

  • No









#Greystructure #Greystructurelaborrate #Laborratepersquarefeet #500SquareyardsLaborrate #Greystructurecost #Constructionrateinkarachi #Greystructurecostinkarachi #Greystructurematerial #Contractioncontractorinkarachi #Builderinkarachi #ConstructureCost #500Squareyardsgreystructurecost #Contractorforgreystructure #Contractorinkarachi #DHAKarachi #BahriaTownKarachi #Bahriatown2 #Constructioncontractorindha #DHAPhase8 #Latestconstructionrate2023 #Architectinkarachi #Toparchitectinkarachi #Zameen.com


2,380 views

Recent Posts

See All
  • Facebook
  • Instagram
  • YouTube
  • LinkedIn
  • Pinterest
Follow Us 
Comments (2)

Guest
Jun 25

120 square yard Only two rooms in first floor construction cost with material and labour?


Guest
Jan 06

What about grey structure cost with material ?

Find out the cost of the project right now

Contact Us

+92 342 3724060 | +92 320 1201651

+9221-37297190

Limitlesszh@gmail.com

18C, Mezzanine Floor 1, Rahat Commercial Lane 3, Phase VI | DHA Karachi

Registered With
FBR_Pakistan_logo.png
Quick Links
Latest Post 